Sunday, December 22, 2024
Home india-news Parliamentary panel highlights telemetry system installation delays in critical flood-prone areas

Parliamentary panel highlights telemetry system installation delays in critical flood-prone areas

by
0 comment

Jul 27, 2024 11:55 AM IST

Parliamentary panel highlights telemetry system installation delays in critical flood-prone areas

New Delhi, A parliamentary panel has highlighted significant delays in the installation of telemetry systems vital for real-time data collection and flood forecasting in some critical flood-prone areas.

Parliamentary panel highlights telemetry system installation delays in critical flood-prone areas
Parliamentary panel highlights telemetry system installation delays in critical flood-prone areas

The committee’s report on the performance audit of schemes for flood control and forecasting, submitted to the 17th Lok Sabha and tabled in the 18th Lok Sabha on Friday, underscores the need for urgent action to ensure timely and effective flood management.

According to the report, the installation of telemetry systems vital for real-time data collection and flood forecasting had been completed at all stations except three: Khanabal under the Chenab division, and Sara Thang and Dambong under the Gangtok division.

The delay at Khanabal is attributed to a court case pending since 2018 while non-clearance from the forest department has stalled installations at Sara Thang and Dambong since 2017.

The Union Ministry of Jal Shakti informed the committee that an alternative location for the Khanabal station had been identified and installation of the telemetry system was expected to commence shortly.

However, the committee expressed its dissatisfaction with the prolonged delays.

“Noting that an alternate location has since been identified for the installation of the telemetry system in place of Khanabal under the Chenab division, the committee fails to fathom the reason for the delay in installation of the same,” the report stated.

Emphasising the critical role of telemetry stations, the committee highlighted their importance in the collection and transmission of automatic real-time data, formulation of flood forecasts, and rapid dissemination of information.

It called for earnest efforts to expedite the installation of the telemetry systems in Sikkim and other pending locations.

“The committee desires that earnest effort should be taken for installation of the telemetry systems in Sikkim in a time-bound manner so as to enable concerned agencies to undertake mitigation measures for reducing the risk of disasters from floods based on the data made available by these stations,” the report stated.

The committee also recommended regular inspections and maintenance for all installed telemetry systems around the country.

Recognising the diverse topography of India and the unpredictable nature of natural calamities, the committee called for a comprehensive action plan and an infallible system to handle worst-case scenarios and improve quick-response measures during floods.

This article was generated from an automated news agency feed without modifications to text.

You may also like

Leave a Comment

About Us

Welcome to Janashakti.News, your trusted source for breaking news, insightful analysis, and captivating stories from around the globe. Whether you’re seeking updates on politics, technology, sports, entertainment, or beyond, we deliver timely and reliable coverage to keep you informed and engaged.

@2024 – All Right Reserved – Janashakti.news